1. Nationality, Navigation Area, Class, Rule, etc.
1-1 Nationality (flag) : *****
Navigation area : Ocean going
Classification Society and Notation
NK, NS* (CSR, BC-A, BC-XII, GRAB 20) (ESP), MNS*, M0, EA
Descriptive Note : Strengthened for heavy cargo loading where hold
nos. 2 & 4 may be empty.
Rules and Regulations
・Maritime Regulations of the Country of Registry
・International Convention on Load Lines, consolidated edition 2005
・International Convention for the Safety of Life at Sea (SOLAS consolidated edition 2009) and amendments
・International Convention for the Prevention of Pollution from Ships,
1973 (Annexes Ⅰ,Ⅳ,Ⅴ, and *Ⅵ), Protocol of 1978 (MARPOL consolidated edition 2006 and 2007)
and amendments
・International Convention for the Prevention of Collisions at sea, consolidated edition 2003
・International Convention on Tonnage Measurement of Ships, 1969 and amendments
・International Tele-Communication, The Radio Regulations, 1998
・Rules of Navigation of Suez Canal Authority, including Tonnage Measurement
・U.S. Coast Guard Regulations for foreign flag vessels operating in the
navigable waters of the United states concerning pollution prevention and
marine sanitation devices
(CFR 33 Part 155, 159 and 164)
・Australian Navigation Regulations: Marine Orders, Part 32 (Cargo Handling Equipment)
・ILO Convention No.92 and 133 on Crew Accommodation on Board Ship (depend
on flag State requirements.
ILO Maritime Labor Convention (MLC 2006) should be considered though
it has not entered into force yet).
・IMO Resolution A.868(20) on Ballast Water Management and “Guidelines for Ballast Water Management and
Development of Ballast water Management Plans” MEPC.127(53).
(“International
Convention for Control and Management of Ship’s Ballast
Water and Sediments, 2004” should be considered though it has not entered into
force yet).
・IMO Res. MSC.151(78) Amended SOLAS regulation Ⅱ-1/3-6 and IMO Res. MSC.158(78) Revised Technical Provisions for Means of Access for Inspections
・IMO BC Code: Code of Safe Practice for Solid Bulk Cargoes, 2004 (IMSBC
(International Maritime Solid Bulk Cargo) Code (MSC.268(85)), which will
supersede
BC Code 2004, should be considered).
・IMO Code: Code of Safe Practice for Cargo Stowage and Securing (CSS), 1992,1994/1995 and 2002 Amendment.
・IMO Recommendation of the Code A.468 (ⅩⅡ) for Noise Level (to be applied to accommodation compartments and engine room)
・ISO Guideline proposal No. 6954 “Guidelines for Overall Evaluation of Vibration in Merchant Ships, 1984” (to be applied to accommodation compartment)
・IMO Res. MSC.137(76), Standards on Manoeuvrability of Ships
・International Convention on Control of Harmful Anti-fouling Systems on Ships (IAFS Convention)
・Hong Kong International Convention for the Safe and Environmentally Sound Recycling of Ships, 2009 (Ship Recycling Convention) should be considered
though it has not entered into force yet).
・IMO Res.Msc.216(82) Performance Standard for Protective Coating for dedicated seawater ballast tanks on all new ships and double side skin spaces of bulk carriers. (PSPC)
・Adoption of the International Maritime Solid Bulk Cargoes(IMSBC) Code
*Applicable parts of MARPOL Annex Ⅵ-Regulations for the prevention of Air pollution from ships
- Technical Code on Control of Emission of Nitrogen Oxides from marine diesel engines(Nox Code), 1977
- Standard Specification for Shipboard Incinerators, resolution MEPC.76(40)
Following new rules and regulations shall not be applied.
(i) IACS U1 SC181
- Bridge Design. equipment arrangement and procedures.
1-2 ENVIRONMENTAL APPROACH
The vessel shall be of designed, constructed and operated in full compliance with the International Regulations, standards, guidelines and recommendations as assigned the class notation ENVIRO
The following International Standards, guidelines and recommendations shall be complied with, where applicable;
1) Diesel Engine Exhaust Nox Content ‐ NOx Technical Code, IMO MP Conf. 3/35 Res.2
2) Refrigerants and fire-fighting gases ‐ Montreal Protocol on Substances that Deplete the Ozone Layer
3) Shipboard incinerators‐ IMO Resolution MECP 76(40) Standard Specification for Shipboard Incinerators
4) Ballast Water‐ Resolution A.868(20), Guidelines for the Control and Management of Ships’ Ballast Water to minimize the Transfer of Harmful Organisms and Pathogens
5) Anti-fouling Paint‐ IMO Resolution MECP 46(30) Measures to Control Potential Adverse Impacts Associated with the Use of Tributyl tin Compounds in Anti-fouling Paints
1-3 GREEN SHIP DESIGN CONCEPTS
The vessel shall be taken of the following green ship design concepts
1) Hull form optimization2) Energy saving device such as starter + rudder bulb etc.
3) Tier Ⅱ compliance diesel engines
4) Automated engine monitoring, auto-tuning and derating5) Waste heat recovery system
6) Optimised cooling system
7) Auxiliary system optimization
8) Low sulphur fuel oil piping system
9) Ballast water treatment system
10) Weight saving11) EEDI consideration
2. KIND OF CARGO
Iron ore, Coal, Grain, Steel roll, Bagged cement, Wood and other packaged dangerous goods
3. Principal Dimensions
Loa : approx. 199.990m
Lpp : 195.000m
B mld. : 36.000m
D mld. : 18.500m
Draft mld. (designed) : approx. 11.200m
Draft mld. (full) : approx. 12.900m
4. Deadweight
Approx. 55,000 metric tons at scantling draft (moulded) of about 11.200m
Approx. 67,000 metric tons at full draft (moulded) of about 12.900m
5. Tonnage and Capacity
Gross tonnage : about 38,600 t (international)
Capacity of hold and tanks
Cargo holds (grain) : about 83,000 m3
Heavy fuel oil tanks (100% full) : about 2,200 m3
L.S. Heavy fuel oil tanks (100% full) : about 185 m3
Diesel oil tanks (100% full) : about 225 m3
Marin Gas oil tank (100% full) : about 130 m3
Fresh water tanks (100% full) : about 920 m3
Water ballast tanks (100% full) : about 34,500 m3
(Including No.3 Cargo Hold)
6. Main Engine
Main engine MAN B&W 6S 60ME-C L4 (Mark8 Low-load tuning) 2-stroke, single acting, direct reversing crosshead diesel engine with exhaust turbocharger
M.C.O.(M.C.R.) 7,715 kw x 82.6
min-1 x 1
set
C.S.O. (C.S.R.) 6,558 kw x 78.2 min-1
This is performed when it is considered
to install the Energy-saving device (stator, NHV propeller and rudder bulb).
The vibration of the ship that adopts 5 or 7 cylinders is
too large.
Therefore, this ship proposes 6 cylinders of little vibration.
Since the M/E type and the parameter of relevant equipments don’t been determined, thus it should make sure the M/E type and then adjust accordingly.
7. Speed and Endurance
C.S.O. (C.S.R.) (85% M.C.O.)(d=11.2m) : about 14.0 knots
C.S.O. (C.S.R.) (85% M.C.O.)(d=12.9m) : about 13.5 knots
Speed at design loaded condition at designed draught, at service output with 15% sea margin.
Endurance : about 27,500 n.m.
8. Fuel Consumption
Daily consumption at speed of 14 knots with sea margin at designed draft condition based on fuel of 42,707 kJ/kg lower calorific value shall be about 24.8 tons/day. (157.4g/kw.h x 6,558kw x 24h = 24.8t at C.S.O.)
9. Complement
Captain class |
2 |
persons |
Officer class |
11 |
persons |
Crew class |
14 |
persons |
Total |
27 |
persons |
9
.10. Material and Workmanship
Unless otherwise specifically mentioned, all material and equipment to be
in accordance with Chinese Industrial Standards (CIS) or equivalent and
all workmanship and standards to be according to the Builder’s practice
and standards.
11. Spare and Gears
All spares and gears except those specifically mentioned hereinafter
to be
as per requirement of Classification Society.
12. Final Dock
Final dock shall not be carried out.
13. Owner’s Supply
(1) Saloon wares, galley and mess utensils, blankets, cloths, linen,
crockery, silver wares, chandlery, books, medicine, bandages and
other consumable stores
(2) Chart, nautical almanac, nautical table, tide table, pilot book, list of
coastal station
(3) Inventories such as carpenter's and boatswain's stores above the Builder’s standard
(4)
Personal computer for Ship’s
office
(Loading calculator shall be provided by shipyard)
(5) Personal computer for ship’s LAN system
(6) Copy machine for Ship’s office
(7) Necessary tool for helicopter winching
(8) Boiler water test kit
(9) Closing devices for In-water Surveys
(10) L.O. , F.O. , etc.
a) The owner shall supply hydraulic oil, lubricating oil and fuel oil before the sea trials
b) The Builder shall pay the cost for the initial charge of hydraulic oil and lubricating oil for other equipment than main engine, generator diesel engines and shafting
c) The quantities of fuel oil consumed during the sea trials shall be borne by the Builder
(11) Suez Canal searchlight
1. General
All structural arrangement and scantlings to be determined in accordance with the applicable rules and the Builder’s standard.
2. Material
Application of steel grade shall a good quality in accordance with the requirements of the Classification Society.
3. Hull Construction
Framing system shall be generally as follows:
Longitudinal framing ・Fore peak tank
・Upper deck
・Top side tanks・Double bottom tank in way of cargo hold
・Side shell in way of engine room
Transverse framing ・Upper deck between hatch ways
・Side shell in way of cargo holds
・Deck house
・Aft peak tank
・Double bottom in way of engine room
4. Rudder
One(1) set of partially balanced, stream-lined hanging type
1. Painting Schedule
(a) Exterior part Shell outside |
|
|
Bottom Flat Bottom Vertical (Incl. Bilge keel) Boot top |
: : : |
EAC x 2 + TFAF x 2 EAC x 2 + TFAF x 2 EAC x 2 + TFAF x 2 |
Top side ( Bow chock outside ) Exterior |
: |
EAC x 2 + EAC x 1 |
Weather exposed deck |
: |
EAC x 1 + ACRF x 1 |
Weather exposed deck house Interior |
: |
EAC x 1 + ACRF x 1 |
Cargo hold bottom Overhead side and bulkhead |
: |
EAC x 2 EAC x 2 |
Fuel oil tank |
: |
No coating |
Fresh water tank |
: |
PE x 2 |
Water ballast tank |
: |
NTE x 2 |
Lub. Oil tank |
: |
No coating |
EAC |
: |
Pure epoxy anti-corrosive paint |
TFAF |
: |
Tin free anti-fouling paint service life (36 months) |
PEF |
: |
Pure epoxy finish paint |
PE |
: |
Pure epoxy paint |
ACRF |
: |
Acrylic finish paint |
NTE |
: |
Non tar epoxy paint (modified epoxy) |
2. Cathodic protection and Galvanizing
Cathodic Protection
(a) Outside of shell
Three (3) years aluminum anode of cathodic protection shall be provided as specified on stern frame, rudder, sea chest, bow thruster tunnel and hull in accordance with the builder’s practice.
No impressed current system to be provided.
(b) Tank
Spot zinc back up anode (welded type) is to be fitted in water ballast tank under following design condition.
Ballast time : 50%
Life of anode : 3.0 years
Mean current density : 5 mA/m2
(c) ICCP
Impressed current cathodic protection system to be installed and the mean current density is 35mA/m2 for hull and 500mA/ m2 for around the propeller at scantling draught.
1. Deck Machinery
(1) Anchoring and mooring
・Windlass combined with mooring winch
Electric, open type without remote control
One (1) Gypsy, Two (2) Hawsers, and One (1) Warping end x 2 sets
CW ab.245kn x 9m/min, HD ab.130kn x 15m/min
Chain:78mm(grade 3)
Hawser :80mm x 200m
・Mooring winch
Electric, open type without remote control
Two (2) Hawsers, and One (1) Warping end x 2 sets
HD ab.130kn x 15m/min
Hawser :65mm x 200m
a. Anchor・・High holding power stockless Each 7,875kg x 2sets
b. Chain Cable・・78mm x 660m (grade 3)
c.
Hawser・・Polypropylen & Polyethylene 80mm x 200m x 6sets
(CE compound)
(3) Cargo hatch cover
Folding type weather tight steel cargo hatch covers is to be provided on each cargo hatchway.
Hold |
Hatch size Length (m) x breadth (m) |
No.1 |
Abt. 21.250 x 20.600 |
No.2~5 |
Abt. 22.950 x 20.600 |
(4) Deck Crane
Four (4) sets of electric type single boom deck crane to be installed on upper deck.
Capacity: 36MT x 28MR
2. Ballast Handling System
(1) Pumps
Motor driven vertical, centrifugal type x 2 sets
(2) Pipes : Glass fiber Reinforced Plastic (GRP)
(3) Valves
Type : hydraulic operated butterfly valve
Material : FC
(4) Tank level gauges : Remote reading electric type
(5) Draft gauges : Remote reading electric type x 1 set
(fore, middle and aft)
3. Accommodation(1) Cabin
Captain, 1st/Eng. and C/Off. class :
Day and bed rooms / Private lavatory with showerOfficer class :
Single berth cabin / Private lavatory with showerCrew class :
Single and double berth cabin / Private lavatory with shower(2) Wall and ceiling
Modular panel finished with PVC foiled for wall and with paint for ceiling
(3) Ventilation for accommodation
Air-conditioning system, package type :
Design conditions
Fresh air rate : 30%
Ambient temperature : summer 32oC / winter 0 oC
Inside temperature : 27 oC / 20 oC
Sea water temperature : 32 oC
(4) Accommodation water service piping system
Sanitary water line
Pipe material : PVC
Fresh water and Hot water line
Pipe material :PVC
Potable fresh water line
Pipe material : PVC
(5) Sewage system
Sewage treatment plant of biological, discharge type for 27 persons and holding tank.
Pipe material : STPG 370E ( Galvanized )4. Steering gear
One (1) set of electro-hydraulic type.
2 sets Hyd. Pump to be provided. (100% each)
5. Fire FightingEngine room
High expansion foam extinguishing system
Local application fire fighting system
Smoke and heat type fire detection with alarm system
Accommodation
Sea water system
Smoke and heat type fire detection with alarm system
Cargo hold
Sea water system
6. Life Saving ApplianceLife boat with boat davit
Free-fall type –27 P x 1 set
Life buoy 14 sets
Inflatable life raft
A pack (27P) x 2 sets
A
pack (6P) x 1 set
E. MACHINERY
1. Main Engine
See above item A.5.
Fuel oil : Up to 380 cSt at 50° C
(marine diesel (A-oil) during low load or in port and heavy fuel oil (C-oil 380 cSt) during MCO/CSO or ocean-going condition shall be used)
Main engine, main generator engines and boiler shall also be designed for burning MGO of 3 cSt at 40℃
2. Main Shafting and Propeller
Intermediate shaft : 1 set
Intermediate shaft : 1
set
bearing
Propeller shaft : 1
set
Stern tube bearing : Cast
iron lined with lead based white metal and lubricated with oil
Stern tube sealing : Bellowless lip type
Propeller
: 1set, Five (5) blades solid
skewed, keyless type
3. Electric Generators
Main diesel generator
Prime mover
Vertical, single
action, Four (4)-cycle, direct injection, water cooled diesel engine with
turbo-charger and air cooler
Engine output :
615kW x 900 min-1
Generator : AC 450V, 3 Phase, 60Hz
Number : 3 sets
Fuel oil : Up to 380 mm2/s /50℃ H.F.O
Emergency generator
Prime mover
Four (4)-stroke diesel
engine
Engine output : 180kW x 1,800 min-1
Generator
: AC 450V, 3 Phase, 60Hz
Number : 1
set
Fuel oil : Marine
Diesel Oil
4. Aux. Boiler
Aux. boiler
Natural circulation vertical water tube boiler
Number
: 1 set
Evaporation max.
: 1,200 kg/h (oil)
1,100 kg/h (exhaust gas)
5. Engine Room Equipment
(1) Air compressor
Air
compressor : 2
sets
120m3/h at 2.94MPa
x 30kw
Emergency : 1 set
(2) Oil purifier
Fuel
oil purifier : 2 sets
2,000L/h x 3.7kw
Lub.
oil purifier for main engine : 2 sets
2,000L/h x 3.7kw x 2set
(3) Pumps
Central cooling fresh water pump 500m3/h x 0.25Mpa x 2sets
Main cooling sea water pump 515m3/h x 0.20MPa x 2sets
Main lubricating oil pump 290m3/h x 0.43MPa x 2sets
Lubricating oil trans. pump 5m3/h x 0.3MPa x 1set
Purifier L.O. feed pump 2m3/h x 0.35MPa x 2sets
Emerg. Fire pump 100m3/h x 0.7MPa x 1set
Fuel oil supply pump 4.1m3/h x 0.4MPa x 2sets
M/E Fuel oil circulating pump 4.5m3/h x 0.6MPa x 2sets
G/E Fuel oil circulating pump 1.5m3/h x 0.7MPa x 2sets
Heavy fuel oil transfer pump 15m3/h x 0.4MPa x 2sets
H.F.O. shifter unit 4.5m3/h x 0.4MPa x 1set
Diesel oil transfer pump 5m3/h x 0.4MPa x 1set
Marine gas oil transfer pump 10m3/h x 0.4MPa x 1set
Stern tube L.O. pump 0.5m3/h x 0.2MPa x 1set
Hot water circ. pump 2m3/h x 0.1MPa x 1set
Fresh water pump 5m3/hx 0.6MPa x 2sets
Drinking water pump 2m3/h x 0.6MPa x 1set
E/R Bilge pump 3m3/h x 0.4MPa x 1set
Boiler water feed pump 2.5m3/h x 1.2MPa x 2sets
Sludge pump 3.0m3/h x 0.4MPa x 1set
Fire & general service pump 230/120m3/h x 0.4/0.7MPa x 1set
Fire & bilge pump 230/120m3/h x 0.4/0.7MPa x 1set
Ballast pump 500m3/h x 0.25MPa x 2sets
Ejector pump 88m3/h x 0.47MPa x 1set
(4) Ventilating fan
Engine room supply ventilating fan 600m3/m x 392Pa x 3sets
Purifier space exhaust fan 180m3/m x 294Pa x 1set
(5) Lifting gear
Over head crane 3.0ton x 1set
Electric driven for hoisting and traveling
Manual driven for traversing
(6) Heat exchanger
Main lubricating oil cooler (Plate) 800kw/h x 1set
Central cooling fresh water cooler (Plate) 3,650kw/h x 2sets
M.G.O. cooler unit (Plate) x 4sets
(7) Heater
M/E fuel oil heater (Steam) 4.5m3/h x 2sets
G/E fuel oil heater (Steam) 1.5m3/h x 2sets
No.1 purifier fuel oil heater (Steam) 2.0m3/h x 1set
No.2 purifier fuel oil heater (Steam) 2.0m3/h x 1set
Purifier lubricating oil heater (Steam) 2.0m3/h x 2sets
Fuel oil shifter heater (Steam) 4.5m3/h x 1set
Calorifier (Steam) 2m3/h x 1set
Main engine fresh water preheater (Steam) 10m3/h x 1set
(8) Condenser
Atmospheric condenser (Shell & tube) 1,410kg/h x 1set
(9) Fresh water generator
Tube type 30m3/day (SW20℃、Heat FW80℃) x 1set
(10) Miscellaneous equipment
Bilge separator 2m3/h x 1set
Control air dryer 55m3/h x 1set
Engine control room unit cooler 36.0MJ/h x 1set
Incinerator Max.200kw/h x 1set
Drinking water sterilizer abt.2,000L/h x 1set
Fuel oil shifter abt.4.500L/h x 1set
Marine growth preventing system abt.620m3/h x 1set
(11) Air reservoir
Main air reservoir (Cylindrical type) 5m3 x 2.94MPa x 2sets
(12) Tank
Heavy fuel oil settling tank 20m3 x 1set
Heavy fuel oil service tank 20m3 x 2sets
L.S. heavy fuel oil settling tank 19m3 x 1set
L.S. heavy fuel oil service tank 20m3 x 2sets
Diesel oil settling tank 6m3 x 1set
Diesel oil service tank 6m3 x 1set
M.G.O. service tank 20m3 x 1set
Fuel oil overflow tank 25m3 x 1set
Sludge tank 3m3/h x 2sets
Emergency generator diesel oil tank 1.05m3 x 1set
Main engine lubricating oil sump tank 18m3 x 1set
Main engine lubricating oil storage tank 18m3 x 1set
Main engine lubricating oil settling tank 18m3 x 1set
Generator engine lubricating oil storage tank 3m3 x 1set
Generator engine lubricating oil settling tank 3m3 x 1set
Forward stern tube sealing oil tank 0.01m3 x 1set
Cooling fresh water expansion tank 1.5m3 x 1set
Cascade tank 4m3 x 1set
Fresh water pressure tank 2m3 x 1set
Drinking water pressure tank 1m3 x 1set
Waste oil settling tank 2m3 x 2sets
Separate bilge oil tank 20m3 x 1set
Clean drain tank 15m3 x 1set
Bilge tank 40m3 x 1set
(13) Machine tool
Lathe (Center distance) Max. 1,000mm x 1set
Drilling machine (Drill diameter) Max. 23mm
Grinder (Diam. Of wheel) abt.250mm x 1set
Electric welder (Second current) 300A x 2sets
Gas welder (Oxygen bottle x 2, Acetylene bottle x 1)
Work bench : 1 set
6. Automation and Control
The notation (M0) is acquired.
Main particulars of control
Engine control room : Provided
Bridge control
for main : Provided
engine
7. Spare Parts
Spare propeller : Not provided
Spare propeller shaft : Not provided
Spare parts for others : Maker
standard including rule
requirement
1. Electric Power Supply System
Generator : A.C. 450 V, 3 phase, 60 Hz
Power equipment : A.C. 440 V, 3 phase, 60 Hz
Alarm system : D.C. 24V
2. Electric Generator
Main diesel generator : 700 kVA
( 560 kW ) 3 sets
Drip-proof type ( IP23 ), F class
insulated,
diesel
driven
Emergency generator : 200 kVA ( 160 kW ) 1
set
Drip-proof
type ( IP22 ), F class insulated,
diesel
driven
No. in use : At Navigation M/G 1 set
At Departure / Arrival M/G 2 sets
At Cargo handling M/G 3 sets
In port M/G 1 set
At Emergency E/G 1 set
Emergency generator is not to be operated in parallel with main generator.
3.
Battery
General use
: 200AH / 24V 1 set
Radio use
: 200AH / 24V 1 set
Emergency generator use :
120AH / 24V 1 set
4. Switchboard
Main switchboard : 1 set (source : generator)
A.C.440-volt Feeder panel : 1 set
A.C.220-volt Feeder panel
Low voltage section board : 1 set (source : generator)
Emergency switchboard : 1 set (source : generator)
Battery charging and discharging panel : 1 set
Protection device
Each generator circuit to be protected by manually operated trip free type air circuit breaker with low voltage and over current trip device.
5.
Transformers
1-bank of three(3) single-phase transformers for general service in the engine
room・・30kVA x 3 sets
1-bank of three(3) single-phase transformers for emergency in the emergency
generator room・・10kVA x 3 sets
1-Three-phase transformer for ship’s fore part lighting in the bos’n store・・
15kVA x 1 set
6. Motor & Starter
Motor: Semi-enclosed, Drip-proof, B or F class insulated
Starter : Group starter panels in engine room
7. On Board Communication
Automatic exchange telephone : 1 set
Common battery telephone : 1 to 2 1 set
Public addressor and talk back system : 1 set
400MHz Transceiver system : 1
set
Walkie-talkie x 5
Helmet set x2
Battery charger x 1
Induce antenna x 2
Engine order telegraph system
: 1 set
main telegraph
Transmitter x 1
Receiver x 1
Do.
x 1
Buzzer x 1
Gong x 1
Sub telegraph
Transmitter x 1 set
Receiver x 1 set
Engine telegraph logger : 1 set
Rudder angle indicator system
: 1 set
Transmitter x 1
Receiver x 3
Propeller shaft revolution indicator system :
1 set
Transmitter x 1
Receiver x 5
Counter x 1
Alarm and signal system : 1 set
General emergency alarm system : 1 set
Fire detecting and alarm system : 1 set
Patrol man call back system : 1 set
Engineer’s call system : 1 set
Refrigerating chamber alarm system : 1 set
Hospital call system : 1 set
Engine room foam discharge alarm system : 1 set
Steering gear alarm system : 1 set
8. Nautical & Radio Equipment
Magnetic compass
1 set
Gyro compass 1 set
GPS navigator 1 set
DGPS navigator 1 set
Electric crystal clock system 1 set
Whistle control system 1 set
Auto-pilot 1 set
Radar
( X-band ) 1 set
( S-band ) 1 set
Doppler log 1 set
Echo sounder 1 set
Centralized electric clock 1 set
AIS 1 set
VDR 1 set
ECDIS 1 set
BNWAS 1 set
Anemometer 1 set
Window wipers 3 sets
Clear view screens 2 sets
Automatic identification system 1 set
Radio equipments for the sea area A1, A2, A3 of GMDSS (Global Maritime Distress and Safety System ) shall be installed.
VHF telephone with DSC transmission 2 sets
MF / HF transmitter / receiver with DSC 1 set
INMARSAT C 1 set
INMARSAT F77 1 set
Radio telegraph station 1 set
Radar transponder 2 sets
Navtex receiver 1 set
Weather facsimile receiver 1 set
EPIRB 1 set
Two way vhf radio telephone apparatus 3 sets
400MHz FM on-board communication equipment 1 set
8. Cable
Cables throughout the vessel shall be constructed in accordance with JIS
which are approved by the Classification Society,
and of 0.6 / 1 kV or 250 V grade insulation to meet the voltage to
which they are subjected.